2A Modified Stone Calculator

2A modified is the Pennsylvania spec base stone — crushed rock with fines that compacts to a hard, sealed sub-base. Enter area and compacted depth.

Crushed stone dust screeded level with a landscape rake and a tape measure showing the installed depth used by a stone dust calculator
Screed depth is the number that decides tonnage. A tape in the finished layer beats an estimate from the top of a loose pile, which sits high by 15-20 percent before compaction.

Your project

inches

Driveways 4-6" compacted. Under a shed or slab, 4". Under heavy truck traffic, 8".

Crews typically order 5-10% extra to cover compaction, spillage and uneven subgrade.

$ / ton

Delivered 2a modified stone typically runs $22-$45 per ton.

2A modified stone needed

11.34

US tons · includes 5% waste

Area
480 sq ft
Volume
6.22 cubic yards
Volume (cubic feet)
168 cu ft
Total weight
22,680 lb
Density used
135 lb per cu ft (1.82 tons/yd³)
Truckloads (15-ton)
1
Estimated delivered cost
$386

Quarry densities vary by source and moisture. Confirm tons per cubic yard with your supplier before placing a bulk order — a 10% density difference is a whole extra load on a big job.

The shareable link reopens this calculator with your exact inputs.

What 2a modified stone is

PennDOT 2A modified is crushed limestone or gravel graded from 1.5 inch down to dust. The fines are what make it "modified" — they fill every void so the material compacts to roughly 135 lb per cubic foot, close to 1.8 tons per cubic yard, far denser than clean stone.

At 135 lb per cubic foot, one cubic yard weighs about 1.82 US tons, and one ton spread 2" deep covers roughly 89 square feet.

How to install it

Place in 4 inch maximum lifts and compact each one with a plate or roller, lightly wetted. Compacted 2A will not rut under a loaded truck; the same material dumped and left loose will.

The mistake that costs the most

Using it where water has to drain through. 2A sheds water by design. Behind a retaining wall or in a French drain it functions as a dam, and the wall or drain fails. Clean #57 goes in drainage zones; 2A goes under things.

The math behind the calculator

Square feet × (depth in inches ÷ 12) = cubic feet. Cubic feet ÷ 27 = cubic yards. Cubic feet × 135 ÷ 2,000 = US tons. The waste allowance is applied to the volume before the weight conversion, which is how suppliers quote it.

Stone tonnage calculator diagram: length times width times depth divided by 12 gives cubic feet, divided by 27 gives cubic yards, times density gives tons
How the calculator works: area and depth become cubic feet, cubic feet become cubic yards, and density converts yards to the tons your supplier bills.

2A modified stone needed per 100 square feet

At 135 lb per cubic foot, before waste.

DepthCubic feetCubic yardsTons
1"8.30.310.56
2"16.70.621.12
3"250.931.69
4"33.31.232.25
6"501.853.38
12"1003.76.75

Recommended depth by application

ApplicationDepth
Shed / slab sub-base4" compacted
Residential driveway base4-6" compacted
Paver patio base4" compacted
Commercial / truck traffic8-12" compacted

Frequently asked questions

+How many tons of 2a modified stone do I need?

Multiply square feet by depth in feet to get cubic feet, then multiply by 135 and divide by 2,000. A 500 sq ft area at 4" needs about 11.25 tons before waste.

+How many tons of 2a modified stone are in a cubic yard?

Roughly 1.82 tons at 135 lb per cubic foot. Wet material weighs 5-10% more, which matters when you are buying by the ton and measuring by the yard.

+How deep should 2a modified stone be?

Shed / slab sub-base: 4" compacted. Residential driveway base: 4-6" compacted. Paver patio base: 4" compacted. Commercial / truck traffic: 8-12" compacted.

+What does 2a modified stone cost?

$22 – $45 per ton delivered in most US markets, before the haul fee. Short loads carry a minimum charge, so half a load often costs nearly as much as a full one.

+How many tons of 2A modified in a cubic yard?

About 1.8 tons compacted, using 135 lb per cubic foot. Loose out of the truck it runs closer to 1.5 tons per cubic yard, which is why suppliers quote tons and not yards.