Cost calculator

New Hampshire paver patio cost calculator

Paver installations in New Hampshire run $17 to $36 per square foot installed, against a national midpoint of $20. New England labour rates with rural haul distances.

Your project

Tumbled, permeable and large-format units carry a material premium.

Typical New Hampshire installed cost

$11,674

480 sq ft · $24 per sq ft

Low estimate
$8,172
High estimate
$17,510
New Hampshire cost factor
122% of national
Base depth required
4" compacted
Materials share (~45%)
$5,253
Labour share (~40%)
$4,669
Base and prep (~15%)
$1,751

Severe frost heave; ledge and boulders often add excavation cost. Paving season in New Hampshire is typically May through October. Figures are planning estimates — get three local quotes before committing.

What drives paver cost in New Hampshire

New England labour rates with rural haul distances. That puts New Hampshire at roughly 122% of the national installed average for segmental paving.

New Hampshire sits in a Northern Freeze-Thaw zone, where paving is attacked by severe frost heave, ledge excavation and heavy spring runoff. Locally that means 12 inches of crushed bank-run gravel of crushed bank-run gravel under a patio, and more under a driveway. That specification difference is a real line item: every extra inch of compacted base adds material, machine time and haul-off of the spoil it displaces.

Labour is about 40% of a paver job — far more than asphalt, which is machine-placed. That is why paver pricing tracks local wage rates much more closely than asphalt pricing does, and why the spread between states is wider here.

How to read a paver quote

A complete quote names the base depth, the bedding sand type, the joint sand product and the edge restraint. If any of those four are missing, the contractor has room to cut the part of the job you cannot see once the pavers are down.

Compare quotes on base depth first. A $24 per square foot quote with 8 inches of compacted base is cheaper over ten years than a $19 quote with 3 inches, because the second one gets rebuilt.

New Hampshire paver cost by project size

Installed, standard concrete pavers, patio base depth.

ProjectAreaLowTypicalHigh
Small patio (10 × 12)120 sq ft$2,042$2,918$4,378
Standard patio (16 × 20)320 sq ft$5,446$7,782$11,674
Large patio (20 × 30)600 sq ft$10,212$14,592$21,888
Single driveway (12 × 40)480 sq ft$10,506$15,176$23,347
Double driveway (20 × 40)800 sq ft$17,510$25,293$38,912

Frequently asked questions

+How much does a paver patio cost in New Hampshire?

Between $17 and $36 per square foot installed, with most homeowners landing near $24. A typical 320 square foot patio therefore runs about $7,782.

+Are paver driveways more expensive in New Hampshire?

Yes — $22 to $49 per square foot, because vehicles require 8 inches of compacted base instead of 4, and 80 mm pavers instead of 60 mm.

+When is the best time to install pavers in New Hampshire?

May through October. Severe frost heave; ledge and boulders often add excavation cost. Booking outside peak season often gets you a better rate, since crews price scarcity in the middle of the season.

+Are pavers cheaper than an asphalt driveway?

No. Asphalt installs at a fraction of the square-foot cost, but pavers last 25-50 years against 15-20 for asphalt and individual units can be lifted and reset. Over the full lifecycle the gap narrows considerably.

+What is not included in a typical quote?

Demolition of an existing surface, drainage work, permits, retaining or step work, and lighting. Add demolition above to see how it moves the total.

+How deep should the paver base be in New Hampshire?

Plan on 12 inches of crushed bank-run gravel of crushed bank-run gravel for a patio, and add a further two to four inches for a driveway. New Hampshire's severe frost heave, ledge excavation and heavy spring runoff punishes shallow bases faster than anything else on the job.

+Do pavers handle New Hampshire's climate better than asphalt?

In a Northern Freeze-Thaw zone, generally yes. Segmental paving flexes with ground movement instead of cracking, and individual units can be lifted and reset where severe frost heave, ledge excavation and heavy spring runoff has caused settlement.

+How accurate are these numbers?

They are national averages adjusted by a New Hampshire labour and material factor, not quotes. Site access, slope, soil condition and pattern complexity each move the real number by 10% or more.